Framing continues at the MSU Surplus Store and Recycling Center, as most of the Surplus side of the facility has its framing completed. On the east side of the buidling the framming has been put in place for the Kel Wall Windows which will provide lots of natural light for the building. Work also has continued on the inner portion as the flooring footings are placed through out the building. Outside grading has been mostly competed on the southern portion of the facility and is also taking place place on the eastern portion of the lot were most of the parking will be.